Marist College Northshore
Builder: Lipman
Architect: WMK Architecture
Location: North Sydney
Completion date: September 2022
AKM was engaged by Lipman to do the internal & external linings on a new, four-level classroom block. The building has general classrooms on the lower levels with science labs on the top floor. The building also features a striking perforated screen on the South elevation and has been designed with wide, sweeping verandahs.